Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan (Q541691)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan |
scientific article; zbMATH DE number 5905038
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan |
scientific article; zbMATH DE number 5905038 |
Statements
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan (English)
0 references
7 June 2011
0 references
scheduling
0 references
batching
0 references
deterioration
0 references
release dates
0 references
dynamic programming
0 references
0 references
0 references
0 references
0 references