Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
The two-machine flow-shop problem with weighted late work criterion and common due date - MaRDI portal

The two-machine flow-shop problem with weighted late work criterion and common due date (Q1772844)

From MaRDI portal





scientific article; zbMATH DE number 2160296
Language Label Description Also known as
English
The two-machine flow-shop problem with weighted late work criterion and common due date
scientific article; zbMATH DE number 2160296

    Statements

    The two-machine flow-shop problem with weighted late work criterion and common due date (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    21 April 2005
    0 references
    Scheduling
    0 references
    Flow-shop
    0 references
    Late work criteria
    0 references
    NP-hardness
    0 references
    Dynamic programming
    0 references

    Identifiers