Two machine mixed shop scheduling problem with controllable machine speeds (Q1821024)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two machine mixed shop scheduling problem with controllable machine speeds |
scientific article; zbMATH DE number 3997539
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two machine mixed shop scheduling problem with controllable machine speeds |
scientific article; zbMATH DE number 3997539 |
Statements
Two machine mixed shop scheduling problem with controllable machine speeds (English)
0 references
1987
0 references
The paper considers a two machine scheduling problem in which the objective is to determine an optimal machine speed pair and an optimal schedule. Each job consists of two operations. We have a mixed shop scheduling problem which means that for a subset of the jobs the order of processing on the machines is fixed (flow shop) and for the remaining jobs the order is free (open shop). The machine speeds are controllable. The objective function takes the form \(C_ 0t^{q_ 1}_{\max}+C_ 1(s')^{q_ 2}+C_ 2(t')^{q_ 2}\), where \(C_ 0\), \(C_ 1\), \(C_ 2\), \(q_ 1\), \(q_ 2\) are constant, \(t_{\max}\) is the makespan of the schedule, s' and t' are the speeds of the two machines. An \(0(n^ 2 \log n)\) algorithm is presented to solve this problem assuming that power and root of the functions encountered in the algorithm can be calculated in constant time.
0 references
uniform machines
0 references
controllable speed
0 references
two machine scheduling
0 references
optimal machine speed pair
0 references
optimal schedule
0 references
mixed shop scheduling
0 references