Modelling set-up times overlapping two periods in the proportional lot-sizing problem with identical parallel machines (Q2825621)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Modelling set-up times overlapping two periods in the proportional lot-sizing problem with identical parallel machines |
scientific article; zbMATH DE number 6638442
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Modelling set-up times overlapping two periods in the proportional lot-sizing problem with identical parallel machines |
scientific article; zbMATH DE number 6638442 |
Statements
13 October 2016
0 references
production planning
0 references
lot-sizing and scheduling
0 references
mixed integer programming
0 references
Modelling set-up times overlapping two periods in the proportional lot-sizing problem with identical parallel machines (English)
0 references