Job lateness in flowshops with setup and removal times separated (Q3157767)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Job lateness in flowshops with setup and removal times separated |
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Job lateness in flowshops with setup and removal times separated |
scientific article |
Statements
Job lateness in flowshops with setup and removal times separated (English)
0 references
19 January 2005
0 references
two-machine flowshop
0 references
ordered flowshop
0 references
setup time
0 references
removal time
0 references
maximum lateness
0 references