Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop (Q330269)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop |
scientific article; zbMATH DE number 6643061
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop |
scientific article; zbMATH DE number 6643061 |
Statements
Two-stage, single-lot, lot streaming problem for a \(1+2\) hybrid flow shop (English)
0 references
25 October 2016
0 references
scheduling
0 references
lot streaming
0 references
hybrid flow shop
0 references
0 references
0 references