A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times (Q342038)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times |
scientific article; zbMATH DE number 6654025
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times |
scientific article; zbMATH DE number 6654025 |
Statements
A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times (English)
0 references
17 November 2016
0 references
capacitated lot-sizing and scheduling
0 references
sequence-dependent setup
0 references
unrelated parallel machines
0 references
Lagrangian relaxation
0 references
simulated annealing
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references