An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system (Q4354087)
From MaRDI portal
scientific article; zbMATH DE number 1060108
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system |
scientific article; zbMATH DE number 1060108 |
Statements
An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system (English)
0 references
23 April 1998
0 references
minimizing flowtime
0 references
maximum lateness of jobs
0 references
two-machine flowshop system
0 references
branch-and-bound
0 references
0 references