Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost (Q457296)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost |
scientific article; zbMATH DE number 6348525
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost |
scientific article; zbMATH DE number 6348525 |
Statements
Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost (English)
0 references
26 September 2014
0 references
bicriteria scheduling
0 references
total weighted completion time
0 references
maximum cost
0 references
Pareto optimal schedules
0 references
0 references
0.90742946
0 references
0.90087706
0 references
0.8973452
0 references
0.89297295
0 references
0.8906479
0 references
0 references
0.8882633
0 references