Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria (Q6669316)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria |
scientific article; zbMATH DE number 7973072
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria |
scientific article; zbMATH DE number 7973072 |
Statements
Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria (English)
0 references
22 January 2025
0 references
late work
0 references
two agents
0 references
deteriorating jobs
0 references
total cost criteria
0 references
scheduling
0 references
0 references
0 references