Optimal scheduling of a two-stage hybrid flow shop (Q857819)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Optimal scheduling of a two-stage hybrid flow shop |
scientific article; zbMATH DE number 5081914
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Optimal scheduling of a two-stage hybrid flow shop |
scientific article; zbMATH DE number 5081914 |
Statements
Optimal scheduling of a two-stage hybrid flow shop (English)
0 references
5 January 2007
0 references
Deterministic scheduling
0 references
Hybrid flow shop
0 references
Branch-and-bound method
0 references
0 references
0 references
0 references
0.9598516
0 references
0.95748055
0 references
0.94000775
0 references
0.9382092
0 references
0.92666924
0 references
0 references
0.9215704
0 references
0.92107505
0 references
0.92033195
0 references