Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals (Q958115)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals |
scientific article; zbMATH DE number 5376976
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals |
scientific article; zbMATH DE number 5376976 |
Statements
Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals (English)
0 references
2 December 2008
0 references
failure-prone systems
0 references
cumulative resources
0 references
0 references