A projective algorithm for preemptive open shop scheduling with two multiprocessor groups (Q969520)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A projective algorithm for preemptive open shop scheduling with two multiprocessor groups |
scientific article; zbMATH DE number 5705348
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A projective algorithm for preemptive open shop scheduling with two multiprocessor groups |
scientific article; zbMATH DE number 5705348 |
Statements
A projective algorithm for preemptive open shop scheduling with two multiprocessor groups (English)
0 references
7 May 2010
0 references
preemptive open shop scheduling
0 references
multiprocessor operations
0 references
linear programming
0 references
0 references