Bicriteria in a two-stage flowshop scheduling problem.
From MaRDI portal
Publication:5928328
zbMATH Open1033.90032MaRDI QIDQ5928328
Publication date: 18 February 2004
Published in: Indian Journal of Pure \& Applied Mathematics (Search for Journal in Brave)
Related Items (2)
A bicriteria flowshop scheduling problem with setup times ⋮ Bilevel programming applied to the flow shop scheduling problem
This page was built for publication: Bicriteria in a two-stage flowshop scheduling problem.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5928328)