Three-stage assembly flow shop scheduling problem with a fixed maintenance period
From MaRDI portal
Publication:6542995
DOI10.1142/S0217595923400195zbMATH Open1540.90112MaRDI QIDQ6542995
Xin Han, Yuan Yuan, Yong Zhou, Xingwu Liu
Publication date: 23 May 2024
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Approximation algorithms (68W25)
Cites Work
- Title not available (Why is that?)
- The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis
- Two-machine flow shop and open shop scheduling problems with a single maintenance window
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Two-machine flowshop scheduling with availability constraints
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- A PTAS for non-resumable open shop scheduling with an availability constraint
- Open shop scheduling problem with a non-resumable flexible maintenance period
- Two-machine flow shop no-wait scheduling with machine maintenance
- Machine scheduling with an availability constraint
- Optimal two- and three-stage production schedules with set-up time included
- An FPTAS for scheduling a two-machine flowshop with one unavailability interval
- Planning Machine Maintenance in Two-Machine Shop Scheduling
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Optimal scheduling of the 3-machine assembly-type flow shop
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- The three-stage assembly flowshop scheduling problem
- Two-machine flow shops with limited machine availability
This page was built for publication: Three-stage assembly flow shop scheduling problem with a fixed maintenance period
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6542995)