Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem

From MaRDI portal
Publication:6554595
Jump to:navigation, search

DOI10.1016/j.ejor.2023.11.009MaRDI QIDQ6554595

Mario Vanhoucke, Dries Bredael

Publication date: 13 June 2024

Published in: European Journal of Operational Research (Search for Journal in Brave)




zbMATH Keywords

project schedulingmetaheuristicsgenetic algorithmsmulti-project


Mathematics Subject Classification ID

Operations research and management science (90Bxx)


Cites Work

  • Two-phase heuristics for scheduling of multiple projects
  • Scheduling subject to resource constraints: Classification and complexity
  • An iterative scheduling technique for resource-constrained project scheduling
  • A learning-based optimization approach to multi-project scheduling
  • A genetic algorithm for the resource constrained multi-project scheduling problem
  • A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
  • A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem
  • Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates







This page was built for publication: A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:6554595&oldid=40085699"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 13 February 2025, at 17:47.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki