Resource overload problems with tardiness penalty: structural properties and solution approaches
From MaRDI portal
Publication:6588471
DOI10.1007/s10479-023-05789-2zbMATH Open1545.90089MaRDI QIDQ6588471
Jürgen Zimmermann, Lena Sophie Wohlert
Publication date: 15 August 2024
Published in: Annals of Operations Research (Search for Journal in Brave)
Mixed integer programming (90C11) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
- The total adjustment cost problem: applications, models, and solution algorithms
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- Optimal project duration for resource leveling
- Resource levelling for projects with schedule-dependent time windows
- Mixed-integer linear programming for resource leveling problems
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Benders decomposition for a period-aggregated resource leveling problem with variable job duration
- A Hybrid Metaheuristic for the Multi-mode Resource Investment Problem with Tardiness Penalty
This page was built for publication: Resource overload problems with tardiness penalty: structural properties and solution approaches