Pages that link to "Item:Q2384842"
From MaRDI portal
The following pages link to A profit-maximizing economic lot scheduling problem with price optimization (Q2384842):
Displaying 12 items.
- Optimal selling price and lotsize with time varying deterioration and partial backlogging (Q708154) (← links)
- Disassembly EOQ models with price-sensitive demands (Q821971) (← links)
- The economic lot scheduling problem without capacity constraints (Q1772974) (← links)
- Profit maximization in simultaneous lot-sizing and scheduling problem (Q1792274) (← links)
- The economic lot scheduling problem -- survey and LP-based method (Q1808726) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- A common cycle approach for solving the economic lot and inspection scheduling problem (Q2358853) (← links)
- Economic lot scheduling problems incorporating a cost of using the production facility (Q3055413) (← links)
- (Q3436597) (← links)
- Economic lot scheduling problem with imperfect production processes and setup times (Q4656665) (← links)
- A Profit-maximizing Plant-loading Model with Demand Fill-rate Constraints (Q4735020) (← links)
- The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy (Q5392023) (← links)