Pages that link to "Item:Q5385459"
From MaRDI portal
The following pages link to A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem (Q5385459):
Displaying 21 items.
- Second order conic approximation for disassembly line design with joint probabilistic constraints (Q320132) (← links)
- A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem (Q324311) (← links)
- A sample average approximation method for disassembly line balancing problem under uncertainty (Q337118) (← links)
- Type-E disassembly line balancing problem with multi-manned workstations (Q779771) (← links)
- An exact solution method for multi-manned disassembly line design with and/or precedence relations (Q821861) (← links)
- Simple and U-type assembly line balancing by using an ant colony based algorithm (Q1011897) (← links)
- Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations (Q1728489) (← links)
- Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions (Q2029912) (← links)
- Robotic disassembly line balancing problem: a mathematical model and ant colony optimization approach (Q2049765) (← links)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches (Q2108816) (← links)
- Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach (Q2664414) (← links)
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times (Q2676318) (← links)
- An integrated approach for a new flexible multi-product disassembly line balancing problem (Q2676357) (← links)
- (Q2772611) (← links)
- Evaluation of mixed-model U-line operational designs (Q2865171) (← links)
- Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems (Q3055445) (← links)
- (Q4624714) (← links)
- An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times (Q5059254) (← links)
- An adaptive genetic algorithm-based and AND/OR graph approach for the disassembly line balancing problem (Q6048212) (← links)
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time (Q6099410) (← links)
- Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem (Q6159499) (← links)