The following pages link to Yeong-Dae Kim (Q204001):
Displaying 43 items.
- Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times (Q337017) (← links)
- Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q342351) (← links)
- A Lagrangian heuristic algorithm for a public healthcare facility location problem (Q363567) (← links)
- Scheduling algorithms for a semiconductor probing facility (Q609817) (← links)
- Scheduling on parallel identical machines to minimize total tardiness (Q856206) (← links)
- Heuristics for search sequencing under time-dependent probabilities of existence (Q868139) (← links)
- A branch and bound algorithm for determining locations of long-term care facilities (Q976416) (← links)
- Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint (Q1009206) (← links)
- Minimizing total tardiness on a two-machine re-entrant flowshop (Q1042154) (← links)
- Minimizing total tardiness in permutation flowshops (Q1127155) (← links)
- Algorithms for a class of single-machine weighted tardiness and earliness problems. Erratum (Q1130085) (← links)
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops (Q1260741) (← links)
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process (Q1278196) (← links)
- Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions (Q1291643) (← links)
- A systematic procedure for setting parameters in simulated annealing algorithms (Q1389193) (← links)
- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints (Q1572969) (← links)
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance (Q1761146) (← links)
- Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network (Q1876171) (← links)
- A backward approach in list scheduling algorithms for multi-machine tardiness problems (Q1891242) (← links)
- Algorithms for a class of single-machine weighted tardiness and earliness problems (Q2277355) (← links)
- A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process (Q2426576) (← links)
- A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property (Q2456645) (← links)
- Minimizing makespan on an \(m\)-machine re-entrant flowshop (Q2459401) (← links)
- Simulated annealing and genetic algorithms for scheduling products with multi-level product structure (Q2563875) (← links)
- Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout (Q3055322) (← links)
- A heuristic algorithm for a production planning problem in an assembly system (Q3157305) (← links)
- A branch and bound algorithm for locating input and output points of departments on the block layout (Q3157355) (← links)
- A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints (Q3636717) (← links)
- Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop (Q4230150) (← links)
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter (Q4245358) (← links)
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter (Q4245377) (← links)
- Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates (Q4319220) (← links)
- A due date-based approach to part type selection in flexible manufacturing systems (Q4394252) (← links)
- A heuristic for setting up a flexible assembly system (Q4399052) (← links)
- A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system (Q4661157) (← links)
- A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness (Q4666773) (← links)
- Layout planning for facilities with fixed shapes and input and output points (Q4706249) (← links)
- Search Heuristics for Resource Constrained Project Scheduling (Q4717126) (← links)
- Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness (Q5289353) (← links)
- Minimizing total tardiness in an unrelated parallel-machine scheduling problem (Q5428943) (← links)
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop (Q5466727) (← links)
- Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems (Q5943940) (← links)
- Algorithms for a two‐machine flowshop problem with jobs of two classes (Q6090515) (← links)