Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q342351)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times |
scientific article; zbMATH DE number 6654163
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times |
scientific article; zbMATH DE number 6654163 |
Statements
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (English)
0 references
17 November 2016
0 references
scheduling
0 references
flowshop
0 references
branch and bound
0 references
limited waiting time
0 references
sequence-dependent setup time
0 references
0 references
0 references
0 references
0 references
0 references