Pages that link to "Item:Q2176838"
From MaRDI portal
The following pages link to Two-agent scheduling on a bounded parallel-batching machine with makespan and maximum lateness objectives (Q2176838):
Displaying 16 items.
- Two-agent scheduling on uniform parallel machines with min-max criteria (Q744634) (← links)
- Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent (Q827243) (← links)
- Bounded serial-batching scheduling for minimizing maximum lateness and makespan (Q1751110) (← links)
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes (Q1751665) (← links)
- Two-agent parallel machine scheduling with a restricted number of overlapped reserved tasks (Q1753463) (← links)
- Bi-objective scheduling on a restricted batching machine (Q1782176) (← links)
- A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives (Q1788999) (← links)
- A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan (Q1991261) (← links)
- Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost (Q2081468) (← links)
- Two-agent bounded parallel-batching scheduling for minimizing maximum cost and makespan (Q2172079) (← links)
- Serial-batching scheduling with two agents to minimize makespan and maximum cost (Q2215193) (← links)
- Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria (Q2283297) (← links)
- Unbounded parallel-batching scheduling with two competitive agents (Q2434303) (← links)
- Bounded parallel-batching scheduling with two competing agents (Q2434316) (← links)
- (Q5197262) (← links)
- Two-agent single-machine scheduling with release dates to minimize the makespan (Q6081603) (← links)