A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan (Q1991261)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan |
scientific article; zbMATH DE number 6968130
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan |
scientific article; zbMATH DE number 6968130 |
Statements
A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan (English)
0 references
30 October 2018
0 references
parallel-batch
0 references
two agents
0 references
release dates
0 references
deterioration
0 references
0 references
0 references
0 references
0.9118472
0 references
0.9099808
0 references
0.9042802
0 references
0 references
0.9008459
0 references
0.8960423
0 references
0.8924711
0 references
0.8919251
0 references