Pages that link to "Item:Q337198"
From MaRDI portal
The following pages link to Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria (Q337198):
Displaying 12 items.
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties (Q454994) (← links)
- Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration (Q1634051) (← links)
- Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine (Q1694914) (← links)
- Complexity of scheduling with proportional deterioration and release dates (Q1787790) (← links)
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs (Q2029301) (← links)
- ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost (Q2284315) (← links)
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems (Q2305016) (← links)
- An uncertain parallel machine problem with deterioration and learning effect (Q2322326) (← links)
- Scheduling with two competing agents to minimize total weighted earliness (Q2399317) (← links)
- Scheduling with competing agents, total late work and job rejection (Q2668778) (← links)
- Two-agent scheduling with linear-deteriorating jobs and release dates on a single machine (Q3193570) (← links)
- Two‐agent scheduling with linear resource‐dependent processing times (Q6072167) (← links)