Pages that link to "Item:Q497626"
From MaRDI portal
The following pages link to General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626):
Displaying 19 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation (Q506145) (← links)
- A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times (Q552221) (← links)
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- Heuristics for the flow line problem with setup costs (Q1303708) (← links)
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (Q1339130) (← links)
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (Q1399596) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times (Q1806709) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan (Q2284308) (← links)
- Modeling and solving the flow-shop scheduling problem with sequence-dependent setup times by firefly algorithm (case study: automotive industry) (Q2676023) (← links)
- A flow-shop problem with sequence-dependent additive setup times (Q3806968) (← links)
- A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times (Q4896692) (← links)
- A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times (Q5477730) (← links)
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (Q5713893) (← links)
- A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times (Q5943566) (← links)