Pages that link to "Item:Q1870802"
From MaRDI portal
The following pages link to Two-machine flowshop scheduling with a secondary criterion (Q1870802):
Displaying 35 items.
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- A two-machine flowshop problem with two agents (Q709115) (← links)
- A matheuristic approach for the two-machine total completion time flow shop problem (Q744632) (← links)
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation (Q922280) (← links)
- A bicriteria flowshop scheduling with a learning effect (Q949943) (← links)
- Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case (Q1046704) (← links)
- The two-machine total completion time flow shop problem (Q1266536) (← links)
- A bicriteria two-machine permutation flowshop problem (Q1296104) (← links)
- Fast algorithms to minimize the makespan or maximum lateness in the two-machine flow shop with release times. (Q1347602) (← links)
- Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. (Q1406627) (← links)
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem (Q1604072) (← links)
- Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic (Q1615940) (← links)
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm (Q1876196) (← links)
- Two-machine flow shop scheduling with two criteria: maximum earliness and makespan (Q1877048) (← links)
- Flow-shop scheduling for three serial stations with the last two duplicate (Q1886869) (← links)
- Approximation algorithms for bicriteria scheduling problems on identical parallel machines for makespan and total completion time (Q2098029) (← links)
- A cyclical search for the two machine flow shop and open shop to minimise finishing time (Q2356124) (← links)
- Mixed integer formulation to minimize makespan in a flow shop with batch processing machines (Q2486757) (← links)
- Best compromise solution for a new multiobjective scheduling problem (Q2489291) (← links)
- Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs (Q2514766) (← links)
- Multicriteria scheduling (Q2566699) (← links)
- Bicriteria train scheduling for high-speed passenger railroad planning applications (Q2566708) (← links)
- Minimising makespan in the two-machine flow-shop with release times (Q3157644) (← links)
- A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints (Q3636717) (← links)
- A FLOWSHOP SCHEDULING ALGORITHM TO MINIMIZE TOTAL FLOWTIME (Q3982632) (← links)
- Two-Stage Flowshop Scheduling Problem with Bicriteria (Q4022255) (← links)
- Scheduling alternative operations in two-machine flow-shops (Q4347419) (← links)
- Parallel flowshop scheduling using Tabu search (Q4474674) (← links)
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem (Q4849290) (← links)
- Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints (Q4921223) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)
- Counting and enumeration complexity with application to multicriteria scheduling (Q5920490) (← links)
- Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date (Q5939594) (← links)
- Local search heuristics for two-stage flow shop problems with secondary criterion (Q5955475) (← links)
- Bicriteria two-machine flowshop scheduling: approximation algorithms and their limits (Q6547130) (← links)