Two-machine flow shop scheduling with two criteria: maximum earliness and makespan (Q1877048)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-machine flow shop scheduling with two criteria: maximum earliness and makespan |
scientific article; zbMATH DE number 2091306
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-machine flow shop scheduling with two criteria: maximum earliness and makespan |
scientific article; zbMATH DE number 2091306 |
Statements
Two-machine flow shop scheduling with two criteria: maximum earliness and makespan (English)
0 references
16 August 2004
0 references
Flow shop
0 references
Makespan
0 references
Maximum earliness
0 references
Efficient solutions
0 references
0 references
0 references
0 references