The following pages link to (Q4387183):
Displaying 14 items.
- Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost (Q457296) (← links)
- A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (Q579120) (← links)
- New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs (Q1044141) (← links)
- Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty (Q1121167) (← links)
- Two-machine flow shop scheduling with two criteria: maximum earliness and makespan (Q1877048) (← links)
- Multicriteria scheduling problems: a survey (Q2773166) (← links)
- An algorithm for minimizing flow time and maximum earliness on a single machine (Q3184459) (← links)
- Single-machine bicriteria scheduling (Q4002567) (← links)
- A bicriterion scheduling problem involving total flowtime and total tardiness (Q4264495) (← links)
- Note: Bicriteria scheduling for minimizing flow time and maximum tardiness (Q4715989) (← links)
- A heuristic approach to bicriteria scheduling (Q4934193) (← links)
- Bicriteria Common Flow Allowance Scheduling with Aging Effect, Convex Resource Allocation, and a Rate-Modifying Activity on a Single Machine (Q5057650) (← links)
- Counting and enumeration complexity with application to multicriteria scheduling (Q5920490) (← links)
- A time-dependent multiple criteria single-machine scheduling problem (Q5954823) (← links)