Two-machine routing open shop: How long is the optimal makespan? (Q2117636)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-machine routing open shop: How long is the optimal makespan? |
scientific article; zbMATH DE number 7495084
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-machine routing open shop: How long is the optimal makespan? |
scientific article; zbMATH DE number 7495084 |
Statements
Two-machine routing open shop: How long is the optimal makespan? (English)
0 references
22 March 2022
0 references
routing open shop
0 references
standard lower bound
0 references
optima localization
0 references
instance reduction
0 references
efficient algorithm
0 references
0 references
0 references
0 references
0 references