A single machine group scheduling problem with due date assignment and position-dependent costs
From MaRDI portal
Publication:6542871
DOI10.1142/S0217595923400079zbMATH Open1540.90098MaRDI QIDQ6542871
Ying Chen, Yi Xu, Gui-Qing Zhang, Yongxi Cheng
Publication date: 23 May 2024
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Cites Work
- Title not available (Why is that?)
- Optimal restricted due date assignment in scheduling
- Due-window assignment scheduling in the proportionate flow shop setting
- Optimal due date assignment and resource allocation in a group technology scheduling environment
- Single-machine group scheduling with processing times dependent on position, starting time and allotted resource
- A comprehensive review of flowshop group scheduling literature
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
- A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties
- Group maintenance scheduling for two-component systems with failure interaction
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Related Items (1)
This page was built for publication: A single machine group scheduling problem with due date assignment and position-dependent costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6542871)