Deterministic constructive \(\nu N\)-NEH+ algorithm to solve permutation flow shop scheduling problem with makespan criterion
From MaRDI portal
Publication:6551067
DOI10.1016/J.COR.2023.106473MaRDI QIDQ6551067
Adam Stawowy, Radosław Puka, Jerzy Duda, Iwona Skalna
Publication date: 6 June 2024
Published in: Computers \& Operations Research (Search for Journal in Brave)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- New hard benchmark for flowshop scheduling problems minimising makespan
- On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem
- A new set of high-performing heuristics to minimise flowtime in permutation flowshops
- Some efficient heuristic methods for the flow shop sequencing problem
- An improved NEH-based heuristic for the permutation flowshop problem
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
- Cooperative metaheuristics for the permutation flowshop scheduling problem
- An empirical analysis of the optimality rate of flow shop heuristics
- The distributed permutation flowshop scheduling problem
- A new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluation
- Parallel hybrid heuristics for the permutation flow shop problem
- A comprehensive review and evaluation of permutation flowshop heuristics
- A computationally efficient branch-and-bound algorithm for the permutation flow-shop scheduling problem
- Benchmarks for basic scheduling problems
- An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers
- An improved NEH heuristic to minimize makespan in permutation flow shops
- Relationship between common objective functions, idle time and waiting time in permutation flow shop scheduling
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Just-in-time scheduling for a distributed concrete precast flow shop system
- \(N\)-NEH+ algorithm for solving permutation flow shop problems
- Optimal two- and three-stage production schedules with set-up time included
- The Complexity of Flowshop and Jobshop Scheduling
- A high quality solution constructive heuristic for flow shop sequencing
- Artificial Intelligence and Soft Computing - ICAISC 2004
- Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem
- Using iterated local search for solving the flow‐shop problem: Parallelization, parametrization, and randomization issues
- Exactly Solving Hard Permutation Flowshop Scheduling Problems on Peta-Scale GPU-Accelerated Supercomputers
This page was built for publication: Deterministic constructive \(\nu N\)-NEH+ algorithm to solve permutation flow shop scheduling problem with makespan criterion
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6551067)